|
The Industry Got Smarter. The Schedules
Didn’t. — Findings from the 2026 State of Construction
Scheduling Report
15 July 12:00 PM EST
Presenter:
Michael Pink, CEO, SmartPM Technologies
AACE Host:
H. Lance Stephenson, CCP FAACE Hon. Life
The 2026 State of Construction Scheduling
Report pairs survey responses from roughly 300 industry
professionals with platform analytics from 120K+ schedules
across 10K+ projects — the largest dataset of its kind. The
findings reveal a defining gap: 70% of respondents say
leadership relies on the schedule for decisions, yet only 24%
are very confident their updates reflect the true state of the
project. In this session, we walk through the report’s core
findings — the structural quality failures behind chronic
delay, the four-act pattern by which projects quietly lose
control, the industry’s shift from AI curiosity to AI
accountability, and the behaviors that separate projects that
stay on track. Attendees will leave with benchmarks grounded in
AACE Recommended Practices and a practical framework for
improving performance on their construction projects through
schedule driven analytics and controls.
Learning Objectives:
-
Benchmark schedule quality and update
integrity against the largest dataset of its kind, drawn
from 120K+ schedules across 10K+ projects.
-
Recognize the structural quality failures
and four-act delay pattern that precede visible schedule
slippage.
-
Evaluate AI and analytics tools for
project controls through a data-integrity-first
lens.
-
Apply a practical framework, grounded in
AACE Recommended Practices, for improving schedule
performance.
Benefits for Participants:
-
Get a first look at findings from the
largest construction scheduling dataset published to
date.
-
See how your projects compare against
benchmarks from 120K+ schedules and roughly 300 industry
professionals.
-
Learn to recognize the early warning signs
that precede chronic delay.
-
Gain a clear-eyed view of where AI in
scheduling stands today and what trustworthy adoption
requires.
-
Walk away with a practical, AACE-grounded
framework for improving schedule discipline on your own
projects.
The webinar is free, but registration is
required. This webinar is generously sponsored by SmartPM
Technologies.
|
コメントをお書きください