About Recommended
Practice 115R-21:
As a recommended practice (RP) of
AACE International, the Cost Estimate Classification System provides guidelines for applying the general principles of estimate classification to
nuclear new build and modification project cost estimates (i.e., cost estimates that are used to evaluate, approve, and/or fund projects). The Cost
Estimate Classification System maps the phases and stages of project cost estimating together into a generic project scope definition maturity and
quality matrix, which can be applied across the nuclear power plant industry.
This recommended practice provides
guidelines to both owners and service providers for applying the principles of estimate classification specifically to project estimates for
engineering, procurement, and construction (EPC) or other contractual arrangements and execution venues, and their related work in ongoing or
developing nuclear power related projects. It supplements the generic cost estimate classification RP 17R-97 by providing:
-
A section that further defines classification
concepts as they apply to the nuclear power industry and their unique differences to other industries.
-
A section on the industry specific quality
assurance and regulatory requirements that might influence the cost estimate.
-
A section on general guidance regarding the
application of productivity factors applicable to labor quantification that are specific to the conduct of work in support of nuclear power
projects.
-
A chart that maps the extent and maturity of
estimate input information (for example, project definition deliverables) into the estimate class.
As with the generic RP, the intent
of this document is to improve communications and consensus among all the stakeholders involved with preparing, evaluating, and using project cost
estimates specifically for the nuclear power industries.
The overall purpose of this
recommended practice is to provide the nuclear power industries with a project definition deliverable maturity matrix that is not covered in RP
17R-97. It also provides an approximate representation of the relationship of planning, preparation, design input data and project scope
deliverable maturity with the estimate accuracy and methodology used to produce the cost estimate.
This document is intended to
provide a guideline, not a standard. It is understood that each enterprise may have its own project and estimating processes, terminology, and may
classify estimates in their own particular way. This guideline provides a generic and generally acceptable classification system for the nuclear
power industries that can be used as a starting point for the basis of comparison. This recommended practice should allow each user to better
assess, define, and communicate their established and developed procedures in light of generally accepted cost engineering practice.
About AACE Recommended
Practices:
The AACE International Recommended
Practices (RPs) are a series of documents that contain valuable reference information that has been subject to a rigorous review process and
recommended for use by the Technical Board. RPs are intended to be the main technical foundation of AACE educational, and certification products
and services. All RPs are available to AACE members free of charge.
We'd like to thank
Riskonnect for sponsoring this webinar!
NOTE: The webinar is free,
but registration is required. CEUs will be available for both members and
nonmembers. You will need to create an AACE International account prior to registering if you do not already have one. Click here and then choose 'Get Started' to create your AACE
account.
|